8/8/2023 0 Comments Bep battery monitorBEP Systems Monitor (Panel Mount) - Inc Shunt (8-00).BEP Systems Monitor (Surface Mount) - Metre Only (8-00 - 113385). BEP Systems Monitor (Surface Mount) - Inc Shunt (8-00 - 113386). NB: *To add more battery banks one of each of the parts below are required for each battery bank (i.e. Charge/discharge amps for two* banks (*needs extra shunt - see below)ĭCSM Comes with Shunt to suit 1 x battery bank:.Tank Level - View tank level information for multiple tanks in numeric and graphic forms. Displays battery capacity in amp hours.Displays charge and discharge (amps) of 1 x battery bank (*or 2 battery banks if extra shunt and cable are added).Displays voltages of multiple battery banks (0-32VDC).600-DCM-5M and 600-DCM-10Mĭisplay Type - Configure the DCSM to show the data in analogue, digital and graphic form.Ĭircuit Status - View the status of important circuits (on/off) In graphic and numeric form Installation kits are available in 5m and 10m lengths. LCD screen draws 70 percent less than equivalent LED screens.Ĭomes supplied with shunt, part No. Selectable legends allow full information to be shown on the screen to avoid confusion, unlike other digital meters available, which only show confusing digits. This meter is an important addition to modern battery management systems. Monitors voltage on up to 3 battery banks, Amps for charge and discharge and capacity remaining in amp hours /percentage utilising peukerts exponent (house bank only) with the added function of a bilge monitor allowing 24 hour monitoring of your bilge pump. The Contour Digital Monitor offers a comprehensive range of functions to allow full monitoring of your batteries and charging systems. If they don't pull their socks up I'll let them have it back.BEP Marinco DC Systems Monitor (Panel Mount) - Suits 8-32V - Incl Shunt - 113408 (SUR 8-00)Ģ.8” Colour LCD Display / Battery Input Voltage 12-24VDC / Charge/Discharge Amps for up to two banksĬapacity remaining in A/h and % / Battery Conditionįresh, Grey Or Black Tank fluid level / Circuit status The BEP is a more modern-looking instrument that should look better on my panel - the Link instruments look like something out of Quatermass!īut as you say, it's all useless unless they support the product. That is very important information that I would like to have, in any case. I looked at the Link range (I only have one large house battery bank of 400 Ahr so I would have a Link 10) but the BEP offers voltage monitoring of two other battery banks or one other battery plus a bilge watch system that records the total time the bilge pump has run and the number of cycles, since last reset. However, I can do it but it won't be that easy due to the silly design. What benefit would a forstner bit give? The terminal block isn't terribly wide and I could easily drill holes with HS twist drill but since the wood is so thick it would be difficult to finish it off nicely. >That will be very easy using a forstner bit in a drill, cut down to the required depth the number of times need to do the length of the block, and then trim up with a chissel, or if you have the space, use a router.>I will have to discuss it direct with NZ.Īt the moment we are in Chichester Marina planning to sail to the Med in the spring. I will not be a happy chap if it doesn't work out after all that! On my boat, the wood is 30mm thick (sic) where I want to mount it so cutting the hole is not going to be easy. This isn't clear from the literature and I was told on the Merlin stand that you could mount it flush without a cutout.they aren't very clued-up or whatever. Incidentally, the module has a ridiculous rectangular teminal block on the rear so you can't mount it straight onto a flat surface, you have to make provision for the cut out. The trouble is that we are talking about very small signals in a very noisy environment and it will be hard to prove whether or not it is being affected.įurthermore, running the wiring is straightforward but will take a long time to do properly on my boat - the best part of a day, I estimate. When I queried this, Merlin were adamant that their wiring was the correct method - though it flies in the face of long establshed electrical practice. Yes the instructions do seem straightforward but they do not give details of the bilge monitoring facility said to be "new for 2004" and the installation example on the Merlin stand was not in accordance with the manufacturer's instructions.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |